PROJECT DESCRIPTION

  • Turn-key bulk corn starch unloading, storage, and transport operation to the existing rail and grits warehouse.
  • A pneumatic rail car unloading system, serving both exit rail lines, will deliver corn starch to 18 new bulk starch silos.
  • A pneumatic transport system that will deliver the corn starch to three new weigh hoppers located in/near the existing grits warehouse.
  • A mechanical transport system will deliver the corn starch into three existing starch slurry process tanks.

 

SERVICES PROVIDED

• Master Planning • Integrated Design • Architectural • Civil • Structural • Mechanical • Electrical

LOCATION

Nava, Mexico