PROJECT DESCRIPTION

This 1,300 SF control room consisted of replacing the existing brewing control facility with a new centralized brewing control center know as the Central Control Room.  The project was phased to allow for the continued brewing control operations during the project with little or no disruption to the brewing process.

MARKET

Industrial – Process/Controls

SERVICES PROVIDED

Integrated Design